Full FAI

Full FAI commonly refers to a complete First Article Inspection performed in accordance with AS9102 or similar aerospace and defense requirements. It involves verifying and documenting every design characteristic on the drawing or model for a part or assembly, rather than a limited subset of features.

What Full FAI includes

In regulated and aerospace manufacturing environments, a Full FAI typically includes:

  • Ballooned drawings or models identifying all required characteristics (dimensions, notes, material, finishes, special processes, etc.)
  • A completed first article inspection report covering every ballooned characteristic
  • Objective evidence such as measurement records, certifications, and process documentation
  • Traceability to the specific part, lot, configuration, and manufacturing process used to produce the first article
  • Signatures or electronic approvals from responsible functions (for example, quality and engineering)

Operationally, performing a Full FAI usually occurs when a part is produced for the first time, after significant design or process changes, or when required by customer or regulatory flowdown. In digital MES or FAI tools, a Full FAI workflow will drive collection of all required data elements rather than allowing partial coverage.

What Full FAI does not include

Full FAI does not typically refer to:

  • Routine in-process or final inspections performed on every batch
  • Sampling inspections that only check a portion of characteristics or units
  • Capability studies or process validation activities, unless specifically tied into the FAI package

Common confusion

“Full FAI” is often contrasted with:

  • Partial FAI: Only characteristics affected by a specific change (for example, drawing revision, tool change, or new supplier) are re-inspected and documented.
  • Delta FAI: A limited update to an existing FAI, documenting only the changes since the last approved FAI.

Unlike general incoming or in-process inspections, a Full FAI is a structured, traceable, and usually one-time or event-driven activity intended to demonstrate that the manufacturing process can produce a part that meets all specified requirements.

Tie to AS9102 context

Within AS9102 programs, a Full FAI usually means completing the entire AS9102 FAI package (all forms and associated evidence) for every applicable drawing characteristic. Digital FAI solutions, Net-Inspect workflows, or MES-integrated FAI modules often distinguish between initiating a Full FAI versus a partial or delta FAI to align with customer and regulatory expectations.

Content classification

Visible verification fields for authorship, dates, taxonomy, and ST assignments.

Published:

Updated:

Categories:

Tags:

FAQ category:

FAQ tag:

Glossary category:

Glossary tag:

Colour:

Content type:

Location:

Audience:

Intent:

Dev-only relationship debug

Content relationships

Rendered from saved content and bridge metadata. Nothing in this panel writes back to WordPress.

Inline glossary links

No inline glossary links found in saved content.

Attached glossary terms

No glossary bridge terms attached.

Attached FAQs

No FAQ bridge items attached.

Diagnostics

Inline glossary links
0
Attached glossary terms
0
Attached FAQs
0
  • No glossary or FAQ relationships found for this item.